Saturday 28 September 2013

Electrical and Data in! 21-09

Its starting to look busy now. Above is a good shot of the PVC plumbing for the upstairs main bathroom. Entire houses are now plumbed with PVC pipes, both hot and cold water in lieu of copper. So no need for cutting copper pipes and welding them back together. Just cut the pipe and clamp it in with clips into a join.


As you can see in the above shots there is quite a bit of data cabling in the house. As we have a small Ethernet network, and quite a few TV aerial cables, mixed in with power cables and duct for the air con.



Friday 27 September 2013

Plumbing in 16 - 09


As we are onsite to sign off on the electrical we notice that the plumbing is already in.

Plumbing for the upstaris bathroom, which sits right above the downstairs laundry.

Plumbing for the upstairs ensuite.





Roof on 9-9-2013

Not exactly exciting from this view, but its on and before a big rain storm! just in time.

Front
Rear