Friday, 27 September 2013

Plumbing in 16 - 09


As we are onsite to sign off on the electrical we notice that the plumbing is already in.

Plumbing for the upstaris bathroom, which sits right above the downstairs laundry.

Plumbing for the upstairs ensuite.





Roof on 9-9-2013

Not exactly exciting from this view, but its on and before a big rain storm! just in time.

Front
Rear




Friday, 30 August 2013

Windows in - 29-08

The windows are in and the scaffold is up ready for the Roof to be put on.








Thursday, 29 August 2013

Lighting choices 10-08


Lighting - Were stepping away from the site for a post and looking at lighting. Something I really quite like for some reason.


This is one of the lights we are thinking of putting in the living areas.
I'm a big fan of wall lighting, and this is what we have planned of the stairs and the media room.




Now I cant split these two. I have them both in mind for the kitchen, over the breakfast bar. We will match the colour of the glass splashback to which ever we choose, and go for a red and while theme for the kitchen.




Roof frame on 24 - 08

The roof frame is on!

The roof has a 12.5 degree slope on it and is really hidden by the facade when looking from the road.

Now we have a really good picture of the whole shape of the house, and I think were still getting used to the size of it.

The deck is not on yet, looking forward to the outdoor man cave!

Level 2 frame 19-08

Level 2 frame:





As you can see in the above front of block photos the facade is showing quite clearly. its not too complicated :), just 3 rectangles which really give that square modern shape. Hopefully not looking to similar to the neighbors.




Monday, 26 August 2013

Ground level frame complete 10/8

It did not take long and the first story was complete.
Front View (Left)
Front View (right)
Rear view(Right)
Rear view(Left)


How we can get a good idea of room sizes and some further insight to the overall size of the home.

EntryGarage Steel support to cover the span over Garage


As you can see the engineered wood joist (I-joist), on the floor of the main hallway in the entry image. They will be used to create the sub floor and provide the structure for level 1.